Community building extension
Proposed floor and roof plans developed from a measured survey.
Selected examples of survey, planning, design-coordination and project-control work. Project identities are withheld where confidentiality or publication consent applies.
Proposed floor and roof plans developed from a measured survey.
Elevation and section coordination with contextual design review.
Elevation development for a portal-framed operations building.
Five facade options compared for cost, programme, buildability and planning appearance.
Constrained brownfield site coordinated for a storage & distribution facility — HGV access, yard, parking and highway constraints resolved together.
Swept-path analysis to an articulated-vehicle design standard, submitted as planning evidence.
Staged planning programme from kick-off through submission to determination — decisions and client approvals sequenced and recorded.
Existing and proposed elevations and sections for a phased dormer project.
Terrace and dormer interface reviewed during works. Shown in progress — not presented as completed work.
Rear access, scaffold and existing masonry recorded before decisions were made.
Design coordination sketch resolving eaves, cladding and ridge details.
Beam and load-path scheme coordinated with the structural engineer's calculations.
Every example here started with a conversation. Tell us what you're planning — or what's gone wrong.
Selected examples of survey, planning, design-coordination and project-control work. Drawings are anonymised presentation extracts, not construction information. Project identities are withheld; photographs showing works in progress are not presented as completed work.